SamplingNewBook online, track your inspection and download reportsOpen the client portal

Sampling

Checked 200, or Looked at 20? How a Shortcut Inspection Moves the Risk Back to the Buyer

A sampling plan is a promise about risk. When a plan calls for 200 units and only a fraction of them are actually opened and examined, the report still says “pass”, but the protection the buyer paid for is gone. This guide puts numbers on that difference, lists the shortcuts that cause it, and shows how to check a report for them.

Rows of export cartons opened for inspection in a factory warehouse, drinkware visible inside each carton
Export cartons opened across the lot for a pre-shipment inspection. Every one of them is opened, not just the one nearest the door.
What this article covers
  • How much protection a smaller sample really gives, in numbers
  • The usual shortcuts, and why they happen
  • Seven things to look for in an inspection report
  • What to write into your booking so the full sample is checked

Why Sample Size Is the Whole Point

An AQL plan works by probability. The larger the sample that is genuinely examined, the more reliably a bad lot is caught. The table below compares the full plan for a lot of 3,201 to 10,000 units at general inspection level II and AQL 2.5 (200 units, accept up to 10 defective) with what happens when only 32 units are examined and judged by the plan ISO 2859-1 gives for that sample size (accept up to 2).

Chance that a lot is accepted, by the share of defective units in it
Defective units in the lot200 units examined (accept ≤ 10)32 units examined (accept ≤ 2)
4%82%87%
6%34%70%
8%7% (about 1 in 14)52% (about 1 in 2)
10%under 1%37%

Calculated with the binomial distribution. AQL 2.5 is the most common level for major defects.

Read the 8% row. If roughly one unit in twelve is defective, a full 200-unit check accepts that lot about once in fourteen inspections. Look at only 32 units and it is accepted about half the time. The report looks the same either way. The difference is who carries the risk: with the full sample it stays with the factory, which has to rework; with the shortcut it moves to the buyer, who finds out from customer returns.

Both plans are legitimate for the lot sizes they belong to. The problem is a report that states one plan and an inspection that carried out the other.

Common Shortcuts

Most shortcuts are not dishonesty so much as time pressure: an inspector with a second factory to reach that afternoon, a warehouse with cartons stacked to the ceiling, a factory keen to help. The effect on the buyer is the same.

A long row of opened export cartons lined up on a clean factory floor ready for inspection
Cartons drawn from across the lot and lined up, each one opened.
Opened cartons with display boxes inside laid out in rows on a showroom floor
Every selected carton is opened and its inner boxes taken out.

How Our Inspectors Draw and Check the Sample

Our inspectors choose the cartons themselves, from different pallets and different levels of the stacks, and open every carton they select. Every unit in the sample is taken out of its packaging, the full sample is laid out and photographed, and each unit is checked against the checklist. Large and awkward products are no exception: flat-pack furniture and long cartons are opened on the floor so the parts can be counted and inspected. The step-by-step method, with photos, is in what a full AQL inspection looks like.

Dozens of flat-pack furniture cartons opened on a showroom floor with panels and frames exposed for inspection
Flat-pack furniture: each selected carton is opened on the floor and the parts are counted and checked against the assembly list.
Long narrow cartons opened in a row on a warehouse floor, with the products visible inside
Long cartons opened end to end, so the full length of the product can be checked.
An opened export carton full of brown plastic animal-shaped products in polybags
Inside an export carton, before the sampled units are taken out of their bags.

Seven Things to Look for in a Report

Our guide to pre-shipment inspection reports covers the rest of the report, and critical, major and minor defects explains the classification.

What to Write in Your Booking or Purchase Order

What Sampling Cannot Promise

Even a perfectly executed AQL inspection accepts some risk, as the 4% row in the table shows: a lot with a low defect rate will usually pass, and some defective units will ship with it. That is the trade-off a sampling plan is designed to make. A full sample keeps that risk at the level the plan states; a shortcut quietly raises it. If your product cannot tolerate any defective units reaching the customer, ask for a 100% inspection of the critical points instead.

Related reading

Want the full sample checked?

Set your sampling plan when you book. Every unit in it is unpacked and checked, and the full sample is in the report photos.

Book an inspection

Back to Insights

Book online