SamplingNewBook online, track your inspection and download reportsOpen the client portal

Sampling

Every Unit in the Sample, Out of the Carton: What a Full AQL Inspection Looks Like

An inspection report says “sample size: 200 pcs”. That line is only worth something if 200 pieces were actually taken out of their cartons, out of their bags and checked one by one. This guide shows what that looks like on a factory floor, using photos from our own inspections: how the cartons are chosen, how every sampled unit is unpacked and laid out, and why the full sample is photographed before a single defect is counted.

About two hundred wooden house-shaped plaques laid out in rows on a factory floor, each one unpacked for inspection
A full sample of wooden plaques, every piece unpacked and laid out in rows so it can be counted and checked.
What this article covers
  • What a sample size such as 200 units means in an ISO 2859-1 sampling plan
  • How the cartons are chosen across the whole lot
  • Why every sampled unit is taken out of its packaging and laid out
  • What is checked on each unit, and what a full sample still cannot tell you

What “200 Units” Means in a Sampling Plan

Under ISO 2859-1 (and its US counterpart ANSI/ASQ Z1.4), the lot size and the inspection level set a sample size, and the AQL sets how many defective units that sample may contain before the lot fails. At general inspection level II, the level used on most pre-shipment inspections:

Single sampling, general inspection level II (ISO 2859-1)
Lot size (units)Sample sizeAQL 2.5 (major): accept / rejectAQL 4.0 (minor): accept / reject
501 – 1,200805 / 67 / 8
1,201 – 3,2001257 / 810 / 11
3,201 – 10,00020010 / 1114 / 15
10,001 – 35,00031514 / 1521 / 22

The accept and reject numbers only hold if the whole sample is examined. They are calculated for 200 units checked, not for 200 units counted and 30 looked at. You can work out the plan for your own lot with our AQL calculator; the logic behind it is explained in AQL sampling inspection for importers.

Step 1: The Inspector Chooses the Cartons, Across the Whole Lot

A sample is only random if the factory does not choose it. Our inspectors select the cartons themselves, from different pallets and from the top, middle and bottom of the stacks, rather than accepting cartons that have been set aside. A common rule is to open at least the square root of the number of export cartons, rounded up. For an order of 5,000 units packed in 250 cartons, that means 16 cartons, with the 200 sample units drawn evenly from all of them.

Spreading the sample matters because problems tend to cluster: a shift that ran a worn mould, a batch of material from a different supplier, the last cartons packed in a hurry. A sample taken from one corner of the warehouse can miss all of them.

Step 2: Every Sampled Unit Comes Out of Its Packaging

A scratch, a short shot in a plastic part or a hairline crack in glass is easy to miss through a polybag and impossible to see inside a closed gift box. Every unit in the sample is taken out of its bag or inner box before it is checked. The packaging itself is checked at the same time: the right bag, the right warning text, the right insert.

Rows of clear glass storage jars taken out of their protective bags on an inspection table, with a weighing scale in the background
Glass jars taken out of their protective bags one by one. Cracks, bubbles and chipped rims only show once the bag is off.

Step 3: The Full Sample Is Laid Out and Counted

Before the detailed checks begin, the whole sample is laid out on the floor or a table, in rows where the product allows it, and photographed. This does three things:

Rows of red printed wooden wall signs laid out on a factory floor in front of the opened export cartons they came from
Printed wall signs laid out in front of the cartons they came from. Print position and colour are compared across the whole sample.
Several hundred retail packs with pink and green header cards laid out in a grid on cardboard
Retail packs laid out in a grid: a missing or misaligned header card is visible immediately.

Step 4: Each Unit Is Checked Against the Checklist

Only then does the unit-by-unit inspection start: appearance and workmanship against the approved sample, dimensions and weight against the specification, assembly and function where the product has moving or working parts, and labels, barcodes and markings against the artwork. Measurements are taken with the tools, not by eye, and the reading is in the photo.

Gold metal star candle holders spread across an inspection table with a digital scale, tape measure and caliper
Metal candle holders on the inspection table, with the scale, tape measure and caliper used to check weight and dimensions.

Where an order has several styles or colours, each one is sampled and checked as its own group, so a problem in one colourway is not diluted by the others.

Pink and blue sports water bottles laid out in two separate groups on cardboard sheets
Two colourways of the same bottle, sampled and laid out separately.
A large number of grey dustpans with red brushes unpacked and spread across cardboard on the floor
Dustpan and brush sets: both parts of every set are unpacked and checked, and the set is checked for fit.

Defects are recorded unit by unit and classified as critical, major or minor against the buyer's list (see critical, major and minor defects). Each defect is photographed on the unit it was found on. When the checks are finished, the units go back into their original packaging and cartons, and the opened cartons are resealed and marked as inspected.

Why It Takes the Time It Takes

Unpacking, laying out and checking 200 units of a multi-part product is most of an inspector's day, before carton checks, on-site tests and the report. That is the honest cost of the sample size in the plan. If an inspection of a large order is reported as finished in an hour or two, it is worth asking how many units were actually handled. Our article on shortcut inspections explains what checking fewer units than the plan does to your risk.

What a Full Sample Still Cannot Do

A sample, however carefully checked, is still a sample. An AQL plan accepts a known statistical risk that some defective units will be in the goods that ship; that is what the acceptance number means. What a full, properly drawn sample removes is the avoidable risk: the defects that were in the sample and were never looked at. When the cost of any defective unit reaching your customer is too high, a 100% inspection or a sort after a failed result is the right tool, and our guide on what to do when an inspection fails covers the options.

Put It in Your Booking

Related reading

Book an inspection that checks the whole sample

Every unit in the plan is unpacked, laid out and checked, and the full sample is in the report photos.

Book an inspection

Back to Insights

Book online